About the project


 

Planning History

The project has a long-standing history and has been subject to numerous planning studies and approval processes, which helped the State Government to determine the route and manage the impacts associated with this development.

Planning for a new route between Perth and Bunbury commenced in the 1970s as part of the original Corridor Plan for Perth and continued throughout the 1980s as part of the regional strategy for the South West corridor.

As part of this planning process, the route was included into the Metropolitan Region Scheme and relevant Town Planning Schemes.

At a State level, the reservation for the NPBH was formally assessed by the WA Environmental Protection Authority (EPA) under the provisions of the WA Environmental Protection Act (1986) through a Public Environmental Review (PER). The project was subsequently granted environmental approval by the Minister for Environment.

At a Federal level, the project was also assessed under Part 8 of Environmental Protection and Biodiversity Conservation (EPBC) Act 1999 for both its direct and consequential impacts and has been granted approval by the Minister for Heritage and Environment.

Consultation has been undertaken with affected stakeholders and landowners, including the local Indigenous community.

Planning for the project has allowed for the construction of a future rapid transport corridor within the median to service the community’s growing transportation needs. The project has also taken into consideration future connections to Mandurah, such as the Mandurah Entrance Road (otherwise known as Road A).

Why is the NPBH needed?

Rapid urban development in coastal areas in the Peel and South West regions, along with increased business and tourism opportunities, have seen substantial traffic growth in the Perth Bunbury corridor.

This population growth and the continued popularity of recreational areas within the South West has increased traffic volumes on the existing coastal highway, which forms the main route to the region.

Traffic volumes on Old Coast Road are increasing by around seven per cent each year, creating greater levels of traffic congestion, reduced road safety and less transport efficiency. Similar traffic and safety problems are also occurring on South Western Highway, the secondary route between Perth and the South West, which services several townships along the route, including Pinjarra.

These impacts reduce the level of service provided by the existing network, and contribute adversely to social and community issues. An increase in traffic is expected to continue in the Perth Bunbury corridor, therefore resulting in an increase in service demands from the road network.

Why can’t the existing road be upgraded?

Progressively upgrading the existing network would maintain target performance, but it would not improve efficiency, safety or social amenity. To achieve these improvements, a new road is needed to provide a viable alternative route and reduce traffic volumes on existing highways.

Public transport system improvements, such as the recently opened Southern Suburbs Railway, will cater for a greater number of trips between Perth and Mandurah and relieve some pressure. However, the regional road network will still need to be upgraded to meet the community’s growing needs.

In the year 2011, if the new highway was not built, traffic is estimated to reach around:

Estimates show that this growth will increase travel times on the coastal road between Safety Bay Road and Lake Clifton from around 65 minutes currently to 70 minutes in 2011 and 90 minutes in 2021.

The continued growth of the State’s South West will rely on an effective regional road network between Perth and Bunbury, and the NPBH will be critical in providing this network.